Saturday, March 1, 2008

Dressing Rooms Refurbished

The Dressing Rooms at Shanganagh Cliffs consist of a 12.20m converted box container which was "kitted-out" on a very temporary basis at the start of the season by Ross Rogerson and Joey O'Reilly in order that the Club could meet the requirements for entering the Leinster Senior League. This temporary job proved sufficient for most of the season, however, it was always the intention of the Board to have a more permanent refurbishment carried out at the end of the season. Following the obtaining of quotations from local carpenters in the Dún Laoghaire area, the Board decided to offer the job to Kevin Murdock, Carpentry & Building Services (Tel: 086 887 3716). With both squads rested over the weekend of the Galway Trip it was decided to avail of this opportunity to totally refurbish the container to provide new seating with under-seat storage areas in both dressing rooms, new storage rooms at either end of the container, new shelving and new strengthened glass for the windows in both the home and away dressing rooms. The completed works were inspected by members of the Board, including Mrs. Lori Kelly, (pictured above) on Saturday March 1st 2008 and all expressed considerable satisfaction with a job very well done indeed. The next phase of the refurbishment will involve a complete paint job - exterior and interior. Just before the arrival of the "A" Squad for the Division 3 game against Park Celtic, the Chairman posted the amended "Code of Conduct" (see bottom of web-blog) and a copy of the Club's Child Protection Policy on the notice board in the home dressing room. Copies of these documents will be made available in booklet form to all members, playing and non-playing, in the near future.

No comments: